Critical-path
4 CVEs tracked since 2002. Since May 2002, none of them reached CISA KEV.
Critical-path CVEs per month
| Month | CVEs | In CISA KEV |
|---|---|---|
| 2002-05 | 2 | 0 |
| 2002-06 | null or fewer | |
| 2002-07 | 2 | 0 |
Products
The products that kept showing up in Critical-path's monthly top three, with their CVEs summed over those months.
Latest CVEs
The 4 most recently published vulnerabilities affecting Critical-path.
- CVE-2002-0786iCon administrative web server for Critical Path inJoin Directory Server 4.0 allows authenticated inJoin administrators to read arbitrary files by specifying the target file in the LOG parameter.5.0
- CVE-2002-0787Cross-site scripting vulnerabilities in iCon administrative web server for Critical Path inJoin Directory Server 4.0 allow remote attackers to execute script as the administrator via administrator ...7.5
- CVE-2001-1315Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, a...7.5
- CVE-2001-1314Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demons...7.5
The record
- Peak rank
- #15 in Jul 2002
- Busiest month shown
- May 2002, 2 CVEs
- Months with a KEV entry
- 0 since May 2002
- Monthly snapshots
- 2 since 2002